Disaster Response Coordination: Plans, Centres and Roles

In a major disaster, hundreds of teams arrive in the field: search and rescue, health, shelter, transport, energy, volunteers. Each knows its own job well; the problem is that these jobs are carried out at the same time, in the same area and without seeing each other. Disaster response coordination is the structure that decides, before the disaster, who makes decisions, who carries them out and how information flows from whom to whom. In this article we explain, step by step, Türkiye’s response system, the command model used at the incident scene, the weak points research has found in coordination, and how an organisation can connect its own teams to this structure.

In short

  • In Türkiye, response rests on the system formed by the Türkiye Disaster Response Plan (TAMP) and provincial disaster response plans; the current version of TAMP was put into force by Presidential Decision No. 6053, published in the Official Gazette on 15 September 2022.
  • Under the Regulation on Disaster and Emergency Response Services, the response organisation consists of four services: operations, information and planning, logistics and maintenance, and finance and administration.
  • A main solution partner is responsible for coordinating each service group; supporting solution partners take part in its work.
  • The common model at the incident scene is the incident command system; when no single agency’s authority is enough, a unified command is set up.
  • A study of the 2023 Kahramanmaraş earthquakes groups coordination problems into seven main themes; communication and information flow is one of them.

What is disaster response coordination?

Coordination means different agencies working towards the same goal without disrupting each other’s work. In disaster response the goal is clear: save lives, reach the injured, shelter people and get the services that keep life going working again.

In Türkiye, the framework for this structure is set by the Regulation on Disaster and Emergency Response Services. According to the text published in 2013, its purpose is to plan all the forces and resources needed in response at national and local level, to ensure they reach the incident area quickly and effectively, and to set out the duties of the units responsible for coordinating the services. In short, coordination is not improvised on the day of the disaster; it is a plan written before it.

This article focuses on the structure of the response. Topics such as communicating with the public in a crisis, choosing a spokesperson and the first message are covered separately in our article on communication in crisis management.

The structure in Türkiye: TAMP, services and service groups

At the centre of the structure is the Türkiye Disaster Response Plan (TAMP). Under Article 6 of the regulation, TAMP is prepared to define the duties and responsibilities of the service groups and coordination units that will take part in response, and it contains the basic principles of response planning before, during and after a disaster. The current version of the plan was put into force by Presidential Decision No. 6053, published in the Official Gazette of 15 September 2022, No. 31954.

The same article states that the response organisation set up under TAMP is structured as four services: operations, information and planning, logistics and maintenance, and finance and administration. Service groups sit under the services, and teams sit under the service groups. In the provinces, the same structure is repeated through the provincial disaster response plan: under Article 8 of the regulation, this plan is prepared under the chairmanship of the governor, coordinated by the provincial disaster and emergency directorate (the provincial office of AFAD, Türkiye’s Disaster and Emergency Management Authority) and integrated with TAMP.

Knowing a few terms is enough to understand the structure:

Key terms of disaster response coordination and their definitions in the regulation
TermMeaning in the regulation
ServiceThe main management unit to which service groups belong (operations, information and planning, logistics and maintenance, finance and administration)
Service groupA group formed according to the nature of the services delivered by the main and supporting solution partners
Main solution partnerThe ministry, agency or organisation responsible for coordinating the services of the service group
Supporting solution partnerA stakeholder that takes part in support of the main solution partner’s work
TeamA sub-unit formed to carry out the duties of the service group
Disaster and emergency management centreA centre where response is coordinated, working around the clock and equipped with uninterrupted and secure IT and communication systems

In other words, an organisation’s role in a disaster is not a general phrase such as “helping out”. The organisation is either a main or a supporting solution partner in a specific service group, and who it reports to is written in the plan.

Coordination centres: from national to district level

Article 25 of the regulation lists the coordination units at two levels. At national level there are the Disaster and Emergency High Board, the Disaster and Emergency Coordination Board, the disaster and emergency management centre of the AFAD Presidency, and the centres of ministries and agencies. At local level there are the provincial disaster and emergency coordination board, the provincial disaster and emergency management centre and the district disaster and emergency management centre.

When a disaster strikes, these centres come into play in a set sequence. Under Article 18 of the regulation, the managers of the provincial centre and the members of the provincial coordination board meet at the provincial disaster and emergency management centre under the chairmanship of the governor and put the provincial disaster response plan into effect. Service group managers take their places with their teams at the predetermined service group headquarters. Field assessment teams tour the areas they are responsible for and report their initial findings to the incident tracking desk at the centre; the information gathered is entered on maps and into the database.

At the scene: incident command and unified command

For the moment-to-moment management of teams at the incident scene, the model widely used around the world is the incident command system. The National Incident Management System (NIMS) doctrine published by FEMA, the US Federal Emergency Management Agency, defines the incident command system as a standardised approach to the command, control and coordination of on-scene incident management: it provides a common hierarchy within which personnel from multiple organisations can be effective. The system has five major functional areas: command, operations, planning, logistics and finance/administration. The similarity with TAMP’s four services is striking.

The two most important concepts of the doctrine for coordination are:

  • Unified command: Set up when no single agency has primary authority or the resources to manage the incident on its own. In this structure there is no single “commander”; the incident is managed through jointly approved objectives. Unified command does not affect each participating agency’s authority, responsibility or accountability.
  • Unity of command: Each person reports to only one person. According to the doctrine, this clarifies reporting relationships and reduces the confusion caused by multiple, conflicting directives.

Studies of the incident scene management system in Türkiye show that this model struggles in practice. In a study published in 2016 in the Journal of Dicle University Institute of Social Sciences, participants from emergency response agencies in İzmir found inter-agency coordination inadequate and said that scene safety was not sufficiently ensured. The study concludes that the incident scene management system is not used effectively enough in Türkiye’s emergency response system.

What does research find weak in coordination?

A network analysis study published in 2021 in the Journal of Pre-Hospital examined the interaction between the service groups and solution partners in TAMP. According to its findings, interaction is low in the services other than operations; the absence of any repeated links in the information and planning service, where interaction should matter most, stands out as one of the weakest areas of the plan. The authors recommend increasing interaction between actors in the information and planning service and clarifying the job descriptions of institutions at national and local level.

A qualitative study published in 2025 in the Turkish Journal of Earthquake Research is based on interviews with experts who worked at the disaster coordination centre during the 2023 Kahramanmaraş earthquakes. It found that coordination problems arose from seven main themes: inter-agency governance dynamics, resource management and logistics, communication and information flow, scene safety and risk management, human resources and team management, institutional structures and bureaucratic processes, and decision systems and leadership. The results highlight the importance of reducing centralisation, modular training, empowering local actors, horizontal organisation, delegation of authority and participatory governance models.

The shared message of the two studies is clear: coordination breaks most often where information flows. If job descriptions are vague, or information from the field does not reach the decision-maker in time, the structure will not work, however well it is drawn.

The communication side of coordination

Türkiye’s response system treats communication as a separate service group. Article 27 of the regulation’s 2013 text names the then Ministry of Transport, Maritime Affairs and Communications as the main solution partner of the communication service group and holds it responsible for coordinating the continuation of uninterrupted and secure communication in a disaster. The same article also provides for the ministry to set up and operate alternative systems to ensure disaster communication. Article 11 of the regulation requires all organisations active in communications to accept free of charge, and deliver, telegraph, telephone, radio, fax and similar communication requests made for help during the response.

The NIMS doctrine also lists integrated communications among its core characteristics: a common communications plan, interoperable communications processes, and systems that include voice and data links. According to the doctrine, this maintains contact among incident resources, achieves situational awareness and facilitates information sharing.

For an organisation, this means planning its own teams’ communication with the same logic: a primary channel, a backup channel that does not depend on the network, and a record. We compared backup channel options in our article on alternative communication methods. Records are a requirement too: Article 22 of the regulation sets keeping records, as far as possible, of all resources used in response as a principle, and Article 23 requires lessons-learned reports to be prepared after the response.

Step by step: connecting your team to the response structure

The following sequence can be applied by a municipal unit, an organisation’s emergency team or a non-governmental organisation:

  1. Find your place in the planFind out which service group you belong to in the provincial disaster response plan, and whether as a main or a supporting solution partner, from the provincial disaster and emergency directorate.
  2. Write roles down by nameDecide in advance who will go to the service group headquarters, who will lead the teams in the field, and the backup for each role.
  3. Protect unity of commandMake sure each team member reports to a single supervisor.
  4. Map the route of the situation reportWrite down to whom, in what format and how often the first findings from the field will be sent. For a shared report format, see our article on information sharing between teams.
  5. Set a backup channel independent of the networkPlan which channel will be used with the centre and within the team when the cellular network goes down, and who will carry which device.
  6. Design records from the startDecide where task, location and message records will be kept; the lessons-learned report is written from these records.
  7. Test it in a drillThe regulation provides for training and drills at national and local level. Test the plan at least once with a scenario in which the network is down.

Our approach

BosNets does not make a coordination plan, nor does it take the place of a command structure; it carries the written information that has to flow through that structure. Our core design choice was not to depend on the network: where there is coverage BosApp works over the internet, where there is none the BosMag device that attaches magnetically to the phone builds a mesh network. Every device that joins the network is also a relay; if the area is very large, the solar-powered BosBase relay station extends coverage.

On the coordination centre side, we designed the browser-based BosLog management interface: live network view, task assignment and timestamped records. That way, the task a team leader in the field defines in BosApp and the location they share appear on the screen in front of the centre; after the response, which information was delivered when can be verified from the record. For organisations, the network can run as a private closed network.

We do not aim to take the place of radio: voice coordination is radio’s job, and we complement it by carrying written messages, location and status.

— Emir Tanrıver, BosNets co-founder

Frequently asked questions

What is the Türkiye Disaster Response Plan (TAMP)?

TAMP is the national plan that defines the duties and responsibilities of the service groups and coordination units that take part in disaster response. Its current version was put into force by Presidential Decision No. 6053, published in the Official Gazette on 15 September 2022. In the provinces, the same structure is applied through provincial disaster response plans integrated with TAMP.

Who is responsible for disaster response coordination in a province?

Under the Regulation on Disaster and Emergency Response Services, the provincial disaster response plan is prepared under the chairmanship of the governor and coordinated by the provincial disaster and emergency directorate, and put into effect at the provincial disaster and emergency management centre when a disaster strikes.

What is unified command?

It is a joint command structure set up when no single agency has the authority or resources to manage the incident on its own. According to the NIMS doctrine, there is no single commander in this structure; the incident is managed through jointly approved objectives and each agency keeps its own authority and responsibility.

How does the coordination centre communicate with the field when the network goes down?

Plans should set in advance a backup channel that does not depend on the same infrastructure as the primary one. Radio keeps voice coordination going; mesh networks that work device to device carry written messages, location and task status without a base station. The two complement each other.

Sources

All posts