The distance between “I told you” and “I never heard it” is one of the most expensive distances in the field. A communication breakdown rarely comes from a single fault; it comes from different links in the chain: the message never arrives, it arrives but is misunderstood, it is understood but nobody knows who should act, or it gets lost at a shift change. Each has a different fix, and a fix applied to the wrong link leaves the problem where it was. In this article we split communication breakdowns into four sources and suggest a practical solution for each: channel, message, receiver and handover.
In short
- A communication breakdown has four sources: the channel (the message does not arrive), the message (it is misunderstood), the receiver (nobody owns it) and the handover (it is lost when work changes hands).
- Türkiye’s Regulation on Emergencies at Workplaces lists communication among the response methods the employer must determine and put in writing.
- NIMS, the US incident management system, describes using plain language instead of codes in incident management as a matter of public safety.
- In closed-loop communication the receiver repeats the message back and the sender confirms it; only then is the loop closed.
- According to HSE, the UK’s health and safety regulator, many accidents have occurred because of communication failures at shift handover.
Where do communication breakdowns come from?
After an operation it is easy to say “we had a communication problem”, but that sentence fixes nothing. To solve the problem you first need to find where in the chain the breakdown happened. A message’s journey can be split into four links: the channel that carries it, the message itself, the person who has to receive it and act, and the transfer of information when work changes hands.
The table below links symptoms often seen in the field to these four sources. Think of the last hitch in your own operation and see which row it falls into.
| Symptom | Source | Direction of the fix |
|---|---|---|
| “The message never reached me.” | Channel | Backup channel, a route independent of the network |
| “I understood something else.” | Message | Plain language, a common term list, a fixed report format |
| “Everyone heard it, nobody did it.” | Receiver | Assignment by name, repeat-back, confirmation |
| “The previous shift didn’t tell us.” | Handover | Structured handover, written record, face-to-face transfer |
This distinction matters, because the most common mistake is giving every breakdown the same medicine. If the message is misunderstood, buying a new device will not help; if the message never arrives, training alone is not enough.
What do the regulations say?
In Türkiye it is written plainly that communication is part of emergency preparedness. Under Article 10 of the Regulation on Emergencies at Workplaces, the occupational safety regulation that governs workplace emergency plans, the employer determines and puts in writing the response methods to be applied when emergencies occur, such as warning, search, rescue, evacuation, communication, first aid and firefighting.
The regulation also requires a list containing the name, surname, title, area of responsibility and contact details of the support staff assigned to emergency teams to be posted visibly in the workplace. In other words, the answer to “who do I reach?” should be ready on paper. But the regulation leaves it to the employer to decide over which channel, in what language and with what confirmation communication takes place. Communication breakdowns are often born in exactly this gap.
Message breakdown: plain language and common terms
If the message arrived but was misunderstood, the problem is usually language. Every team has its own abbreviations, codes and place names; these shortcuts work inside the team but produce breakdowns as soon as another team or a new employee joins in.
The National Incident Management System (NIMS) doctrine published by the US Federal Emergency Management Agency (FEMA) is clear on this: using plain language and clear text, not codes, in incident management is a matter of public safety, especially the safety of incident personnel and those affected by the incident. According to the doctrine, personnel should use plain language in all communications between organisational elements during an incident, whether oral or written, and should avoid acronyms or jargon unique to one agency during incidents involving several organisations.
The same doctrine lists common terminology among the core characteristics of incident management: functions, units and resources are given standard and consistent names. In practice this is simple: write area names, team names and task statuses on a single list before the operation and make sure everyone uses the same list. A common report format also helps the message arrive in the same order every time; we explained this with the M/ETHANE example in our article on information sharing between teams.
Receiver breakdown: closed-loop confirmation
This may be the most insidious breakdown: the message went over the right channel in the right language, everyone heard it, but nobody acted. Either everyone assumed someone else would do it, or the sender never checked that the message was understood.
Closed-loop communication, used in training healthcare teams, closes this gap. The American Hospital Association’s (AHA) TeamSTEPPS video toolkit defines it this way: the person receiving an instruction or information repeats it back to make sure the message is understood correctly, and the sender confirms to close the loop. The same source stresses that it does not require more time, and is in fact likely to save time, and adds that it is not just for chaotic or emergency situations.
Adapted to the field, the loop has three steps:
- Send: Direct the message to one person by name. Not “someone close the valve”, but “Ahmet, close valve number 3.”
- Repeat back: The receiver repeats the message in their own words: “Closing valve number 3.”
- Confirm: The sender confirms it was understood correctly or corrects it. When the job is done, the receiver reports that it is complete.
Another source of breakdown on the receiving side is overload. If too many people report to one lead, some incoming messages are missed. The NIMS doctrine gives the optimal span of control for incident management as one supervisor to five subordinates, and adds that this is a guideline and the actual distribution is decided for each incident. Appointing intermediate leads as the team grows keeps message traffic manageable.
Handover breakdown: shift and command changes
Information is lost most often when it changes hands. The outgoing shift assumes the incoming one knows; the incoming shift does not know what to ask. The shift handover page of the UK Health and Safety Executive (HSE) states that many accidents have occurred because of failure of communication at shift handover, and that the majority of these involved planned maintenance work. The same page notes that one of the many factors that contributed to the Piper Alpha disaster was failure of information transmission at shift handover.
According to HSE, shift handover should be conducted face-to-face, be two-way with both participants taking joint responsibility, be done using both verbal and written communication, be based on an analysis of the information needs of incoming staff, and be given as much time and resource as necessary. HSE adds that many of these principles are relevant to other types of safety-critical communications.
A change of command is also a handover. According to the NIMS doctrine, when command transfers the process includes a briefing that captures essential information for continuing safe and effective operations, and notifying all personnel involved in the incident. The second part is often skipped: the commander has changed, but the team in the field still sends its messages to the old one.
Structured handover forms help here, but they need to be kept in proportion. In an action research study published in the Turkish nursing journal of Dokuz Eylül University, the SBAR communication tool was used at nurse shift handover; 86.4 per cent of the nurses reported that they thought the tool wasted time, and the study concluded that, because of workload, most of the nurses did not want to keep using the form. The lesson is clear: a handover format should be short and ask only for information that is really needed, or it stays on paper. We covered what shift handover looks like on a construction site in our article on construction site team communication.
Channel breakdown: when the network drops
The fourth source is the most visible one: the message never arrives. A valley with no coverage, a basement, a congested network or infrastructure collapsing after a disaster can leave a team silent in an instant. Language or confirmation rules cannot help here; a second route is needed.
The solution is to set a primary and a backup channel in advance for each critical type of information, and to make sure the backup does not depend on the same infrastructure as the primary. We compared the options, from a second operator line to radio, satellite devices and mesh networks, by what they depend on and what they carry in our article on alternative communication methods. Voice radio is indispensable for instant coordination; a channel that carries written information such as location, tasks and records complements it. We explained with diagrams how a hybrid set-up that works over the internet where there is coverage and over a device-to-device network where there is none operates in our article on hybrid communication.
Step by step: solving a communication breakdown
The sequence below works for anything from a small maintenance crew to a multi-team operation:
- Diagnose the last breakdownClassify the most recent hitch using the table: channel, message, receiver or handover? If it is more than one, write them all down.
- Put communication in writingAs the regulation requires, write the communication method into the emergency plan: who, to whom, over which channel, in what order.
- Draw up a common term listGather area, team and task status names on one list; remove internal codes from the shared channel.
- Make the closed loop a ruleFor critical instructions, require assignment by name, repeat-back and confirmation. Measure this in exercises during the first weeks.
- Shorten the handover formatPrepare a one-page format for shift and command handovers; open jobs, risks and pending instructions are enough. Hand over face to face and record it.
- Set the backup channelDefine a backup route independent of the network for each type of information and make sure the team knows it.
- Look back through the recordsAfter the operation, check from the records which message reached whom and when; find the broken link from records, not guesswork.
Our approach
When we designed BosNets, we aimed to address at least two of the four breakdown sources directly inside the system. On the channel side, our core choice was not to depend on the network: where there is coverage BosApp works over the internet, where there is none the BosMag device that attaches magnetically to the phone builds a mesh network, and the switch is automatic. The emergency button on the device puts the name and location of the person who pressed it on the screen of everyone on the network, for moments when the phone cannot be reached.
On the receiver and handover side, we valued the written record. In BosApp, team leaders assign tasks and track which task is at which stage, so the question “who was supposed to do it?” is answered on screen. In the browser-based BosLog management interface at the coordination centre, all communication is archived with timestamps; at the end of a shift or operation the communication and task record can be reported, and which information was delivered when can be verified later.
No device can solve the message side on its own; plain language and repeat-back are team habits. Nor do we aim to take the place of radio: voice coordination is radio’s job, and we complement it by carrying written messages, location and status.
— Emir Tanrıver, BosNets co-founder
Frequently asked questions
What is the most common cause of a communication breakdown?
There is no single cause; a breakdown happens in one of the links: channel, message, receiver or handover. Before starting on a fix, you need to identify which link the last hitch was in, because each has a different solution.
Is closed-loop communication needed for every message?
Not for every conversation, but yes for critical instructions, location information and safety-related alerts. The receiver repeating the message back and the sender confirming it takes a few seconds; AHA’s TeamSTEPPS material states that it does not require more time and is likely to save time.
How do you prevent communication breakdowns at shift handover?
HSE recommends that handover be face-to-face, two-way, both verbal and written, based on the information needs of incoming staff, and given enough time. A short, fixed handover format and a written record keep information from depending on a single person.
How do teams keep communicating when the network drops?
A backup channel that does not depend on the same infrastructure as the primary should be set in advance. Radio keeps voice coordination going; mesh networks that work device to device carry written messages, location and status without a base station. The two complement each other.
Sources
- Regulation on Emergencies at Workplaces (Official Gazette, 18.06.2013, No. 28681), articles 4, 10 and 11 (in Turkish)
- FEMA (US): National Incident Management System, Third Edition, October 2017
- American Hospital Association (US): Closed-Loop Communication, TeamSTEPPS Video Toolkit
- HSE (UK): Shift handover
- Gülçin Cengiz, Şeyda Seren İntepeler: Improving and Evaluating Nurse Handover Process by Using Patient Safety Communication Tool, DEUHFED, 14(4), 404-412, 2021 (in Turkish)